A SUPER THERM project becomes easier to evaluate when its information is organized into a concise project file. The file should connect the roof survey, the required result, the proposed coating system and the evidence needed for acceptance. This approach helps a facility team move from interest in a product to a scope that engineering, purchasing and the applicator can all review.
SUPER THERM is a ceramic coating intended for solar heat-gain management on roofs and building envelopes. GOLDTEC can help review its potential role in a suitable system. This guide provides a practical structure for preparing that review, planning a representative trial and retaining records that remain useful after installation.
Create a roof identification sheet
Give each roof area a reference and record its material, approximate area, orientation and current use. Include photographs and a simple location plan. Distinguish separate buildings or extensions where construction differs. An area that appears continuous from ground level may contain several substrates, previous repairs or coating systems that require different preparation and compatibility checks.
Record access restrictions and relevant work constraints. Identify roof-mounted equipment, penetrations, drainage routes and areas that require specialist access arrangements. The responsible site personnel should establish safe access and structural considerations. A coating survey does not replace that assessment. Including these facts early prevents a product-only estimate from being mistaken for a complete installation budget.
Write the thermal objective in measurable terms
Describe the operational problem and the outcome that matters to the building. This could concern conditions in a work zone, roof heat gain or an energy assessment under defined operation. Record working hours, ventilation, HVAC use and major internal heat sources. Without this context, a roof-surface observation can be confused with a prediction of indoor temperature or cooling cost.
State how the objective will be assessed and who owns the assessment. If existing measurements are available, include their locations, timing and method. Mark estimates clearly. The objective sheet provides a reference for deciding whether a proposed trial is useful and whether the final evidence answers the original question. It also prevents informal expectations from changing during procurement or after installation.

List roof defects and separate repair responsibilities
Map corrosion, unstable coating, damaged sheet, leaks, failed joints and water retention. These conditions affect the system and the installation programme. Identify which defects require repair before the coating work and who will approve the repaired substrate. A roof heat-control proposal should not silently assume that another contractor has already resolved every underlying issue.
Give waterproofing details their own scope. Joints, fasteners and penetrations may require compatible repair materials and specific detailing. Drainage problems need assessment as well. The coating's intended solar heat function does not establish that all leak mechanisms have been addressed. Clear repair responsibilities make it possible to inspect the roof at meaningful stages before subsequent layers conceal the work.
Assemble the technical submittal
The submittal identifies SUPER THERM and the complete proposed system for each roof area. Include current manufacturer documents, preparation requirements, compatible underlying layers, application conditions and relevant inspection. If existing coatings are unknown, describe the investigation or trial needed to establish suitability. The resulting document should make assumptions visible rather than presenting them as confirmed facts.
| Project item | What the file should identify |
|---|---|
| Substrate | Roof area, material and condition |
| Existing layers | Known products or unresolved identification |
| Preparation | Required result and acceptance point |
| System | Products, sequence and technical basis |
| Verification | Quality checks and performance assessment |
| Handover | Records, limitations and maintenance guidance |
Keep product evidence within its documented scope. A laboratory or surface-property result does not establish a universal building-temperature reduction or energy-saving percentage. If a claim is important to approval, include the supporting source and explain how it relates to the project. This gives reviewers something concrete to assess instead of relying on a shortened presentation slide.
Plan a representative trial if one is needed
A trial should use a roof area that represents the relevant substrate and condition. Apply the intended preparation and system, and document any differences from the proposed full installation. A convenient clean patch may be useful for appearance but insufficient for investigating the preparation problems found across the rest of the roof.
Define the questions the trial must answer. Application practicality, compatibility, appearance and thermal assessment may require different observations. For measurements, record weather, building operation and locations. Avoid comparing isolated readings taken under different conditions without explaining those differences. The trial report should state what was demonstrated and what remains outside the evidence, so the broader decision can account for those limits.

Record installation in a way the owner can use
Agree inspection points and records before work starts. These should follow the approved system and include substrate acceptance, material identification and relevant application conditions. Identify who approves each stage and how defects are corrected. Keep references to roof areas so records can be connected to the actual location rather than stored as an unstructured collection of photographs.
If unforeseen defects or weather interruptions change the procedure, document the technical review and accepted action. A revised preparation method or layer sequence should not be treated as a minor administrative change when it affects the approved system. The final record should describe what was installed, including repairs and limitations, so maintenance has an accurate basis for future decisions.
Prepare the roof for ongoing maintenance
Keep the roof survey, approved submittal, inspection results and repair guidance together at handover. Identify drainage and detailing checks, and explain how later roof work should be reviewed. Equipment installation, service visits and local penetrations can affect both protective coatings and waterproofing. Recording those interventions helps distinguish a new local issue from a problem in the original work.
Use cleaning and repair methods appropriate to the installed system. If service conditions change, such as new equipment discharges or a different roof-use pattern, assess the effect rather than assuming the original specification covers every future exposure. A useful maintenance record preserves the link between the coating system, the intended function and the actual condition of the roof over time.
Start the project review with GOLDTEC
Send GOLDTEC the roof identification sheet, defect photographs, thermal objective and existing layer information. Include access restrictions, shutdown or scheduling needs and any mandatory specification. If the project is still at a feasibility stage, identify the information that has not yet been confirmed. This helps target the next site investigation or technical discussion.
Use the enquiry form to discuss SUPER THERM and request a proposal with clear assumptions. A structured project file makes that proposal easier to assess and gives the applicator a defined basis for planning. It also ensures that the work ends with usable evidence and maintenance information, rather than only an invoice identifying the principal product purchased.
Frequently asked questions
What is SUPER THERM used for in a roof project?
SUPER THERM is a ceramic coating intended for managing solar heat gain on roofs and building envelopes. Assess it within a complete system suitable for the substrate, existing layers and project requirements.
Which documents should the technical submittal contain?
Identify the exact product, current technical and safety documents, substrate preparation, compatible layers, application requirements, inspection and repair guidance. Include the roof survey and any agreed trial or performance assessment.
Should waterproofing repairs be included in the same proposal?
If the roof has leaks or damaged details, allocate the required diagnosis and repairs clearly. They may be coordinated within the project, but heat control and waterproofing should each have a defined scope and compatible materials.
Does a successful pilot establish identical results across every roof?
A pilot provides evidence under its documented conditions. Other roof areas may differ in substrate, shading, damage or operation. Use the result with the survey and the broader project requirements rather than extending it without checking those differences.
How can I request a SUPER THERM proposal?
Send GOLDTEC the roof type, area, photographs, existing layers, building use, thermal objective and access conditions. Include leak or corrosion information and any available measurements with their collection method.
Sources and technical references
Manufacturer data applies to a specific grade and system. Define the project specification against the substrate, exposure and current manufacturer instructions.