A heat reflective roof coating can be considered when an industrial building needs to manage solar heat gain at the roof surface. The decision should begin with the building and its existing roof rather than with a colour chart. Roof condition, operating patterns, ventilation and other heat sources affect both the suitable coating system and the result that can reasonably be assessed.

This guide explains how to evaluate a roof heat-control project using SUPER THERM and compatible protection measures where required. GOLDTEC can help review the roof information and product options. The aim is to prepare a project scope that distinguishes thermal objectives, substrate repairs and verification, making technical and commercial proposals easier to compare.

Establish the building problem you want to solve

Describe where and when heat affects the operation. A warehouse with a directly exposed metal roof differs from a conditioned production area with a ceiling and several envelope layers. Internal machinery may contribute substantially to the heat load. Record working hours, ventilation and HVAC operation so the roof's role can be considered in context rather than assumed from a hot roof surface alone.

Set an objective that can guide the assessment. This may concern conditions in a work area, heat gain through the envelope or cooling energy under defined operation. These are different measures. Agree which one matters and how it will be evaluated. A clear objective prevents a project from being judged afterward against a different outcome that was never part of the original design.

Understand what the coating data describes

Review the exact product and the meaning of the reported performance. A surface property or laboratory result is evidence under specified conditions. It does not directly state the temperature reduction in every building or a fixed reduction in electricity bills. Ask for the supporting documentation and keep the test conditions visible when comparing materials.

Distinguish solar heat control from bulk insulation. A coating at the roof surface and insulation within the envelope work through different mechanisms. The appropriate project may use one approach or a combination, depending on the building and its requirements. A thin coating should not be assigned an assumed equivalence to an unspecified thickness of another material without a valid basis for that comparison.

Illustration of the coating system or application
Image from the website application library, illustrating the type of substrate or application. It does not document a project described in this guide.

Survey the existing roof before specifying layers

Identify roof material, existing membranes or coatings and their condition. Record peeling, chalking, corrosion, previous repairs and areas where water remains. Photograph joints, fasteners, penetrations, edges and equipment supports. These details help identify preparation requirements and show whether the project includes problems that cannot be addressed by coating the broad roof surface alone.

Access and structural suitability need attention from the appropriate site personnel. A coating survey does not certify that a roof is safe to walk on. Establish access arrangements and work limitations before committing to an installation method. A small complex roof with many obstacles may need a different programme and budget from a larger unobstructed surface, even when the coating product is the same.

Separate waterproofing and corrosion from heat control

Leaks through failed joints or damaged roofing require diagnosis and suitable repair details. Drainage problems also require their own assessment. A heat-control layer should be applied over a system that is appropriate for the roof, rather than expected to compensate for unresolved mechanical or waterproofing defects. Define which party designs and completes these repairs.

On steel roofs, assess corrosion and the condition of the sheet. Where suitable, RUST GRIP can be examined as part of a corrosion protection system, with preparation and compatible subsequent layers. Coating does not restore the strength of perforated or weakened sheet. Record replacement or engineering repair requirements before defining the areas to be coated.

Evaluate SUPER THERM within the complete system

SUPER THERM is a ceramic coating intended for managing solar heat gain on roofs and envelopes. Its suitability depends on substrate condition and the specified system. Review current manufacturer information for preparation, compatible layers and application requirements. Where existing coatings are unidentified, agree how compatibility and adhesion will be assessed before widespread installation.

Ask for a system description rather than a product-only quotation. It should identify cleaning, removal of unstable material, local repairs, protection layers and the heat-control coating where required. Clarify the treatment of joints and penetrations. This makes the scope reviewable and allows procurement to understand why two quotations using the same principal product may include very different amounts of work.

Preparation and application considerations
Image from the website application library, illustrating the type of substrate or application. It does not document a project described in this guide.

Design a measurement plan that answers the objective

Surface temperature, internal envelope temperature, occupied-zone air temperature and energy consumption are distinct measurements. Choose the relevant ones before work starts. Record weather and operating conditions, and keep measurement locations consistent. If a trial area is used, select a representative part of the roof and document differences in shading, orientation and substrate.

For before-and-after comparisons, account for changes in production, occupancy, ventilation and HVAC settings. A cooler day after installation does not isolate the coating's contribution. Energy assessment may require a longer comparison and adjustment for operating conditions. The method should match the decision being made, whether that is selecting a system, assessing a pilot or evaluating a completed project.

Plan application quality and roof maintenance

The installation plan should include preparation acceptance, material identification, application conditions and checks required by the specification. Agree how inaccessible details and changes in weather will be managed. Define the handover record before work begins so that the completed project includes evidence of what was installed and where repairs or additional layers were used.

Maintenance should address drainage, accumulated contamination and damage from later roof work. Installing equipment can disturb both coating and waterproofing details. Keep a record of interventions and inspect affected areas after such work. Use the system's cleaning and repair instructions rather than selecting maintenance chemicals or local patch materials without checking compatibility with the existing layers.

Send the right information for a roof proposal

Contact GOLDTEC with the roof area, material, condition, existing layers and clear photographs. Describe the building's use, working hours and principal heat concern. Include known leaks, corrosion, planned equipment changes and access restrictions. Existing temperature or energy data is helpful when accompanied by information on how and when it was collected.

Use the enquiry form to request a review of SUPER THERM and any associated roof protection requirements. Ask for assumptions, preparation and verification to be stated in the proposal. A project defined this way can progress from a search for a heat reflective roof coating to a practical scope that addresses the actual roof, the operating need and the evidence required to evaluate the result.

Frequently asked questions

Does a heat reflective coating replace roof insulation?

The mechanisms are different. Solar heat-control coatings act at the roof surface, while bulk insulation provides resistance to heat transfer through the envelope. Evaluate the building requirement and consider whether a combination is appropriate.

Will a reflective coating stop roof leaks?

Do not assume that a heat-control coating resolves failed joints, penetrations, damaged sheets or drainage problems. Diagnose leaks separately and specify compatible repairs or waterproofing details as part of the roof system.

How should cooling savings be estimated?

Use building and operating data, together with an appropriate measurement or modelling approach. Weather, ventilation, internal heat sources and HVAC operation influence energy use. A product name or a single surface-temperature comparison cannot establish a universal savings percentage.

Can SUPER THERM be used on an existing roof?

It can be considered where the substrate and complete system are suitable. Survey existing layers, condition and details, then review the current product instructions. Corrosion or unstable coatings may require additional preparation and protection before the heat-control layer.

What information helps GOLDTEC assess the roof?

Provide roof type, area, photographs, existing coatings or membranes, corrosion and leak information, building use and access conditions. State whether the main objective is solar heat control, refurbishment or a combined roof project.

Sources and technical references

Manufacturer data applies to a specific grade and system. Define the project specification against the substrate, exposure and current manufacturer instructions.

Share this guideLinkedIn ↗WhatsApp ↗